Wednesdays are my “no work” days, however I did take a second to take stock of the remaining initiatives within the room. My authentic aim was to get this room completed by the top of February. Will I make my aim? Nicely, let’s check out what nonetheless must be finished.
First, these transition strips nonetheless want work. I’ve determined to stain them to match the carpet, in order that must be fast and simple.

All the perimeter of the room, nonetheless wants quarter spherical.

I don’t need the curtains to be pooled on the ground, so these should be hemmed. And I maintain forgetting that I’ve a ceiling fan for this room. I have to get that put in.

The Swedish ladder has been assembled, however I nonetheless need to stain the wooden bars, after which I would like to determine methods to connect this heavy factor securely to the wall. That shall be a problem.

Each doorways within the room nonetheless should be painted (I’m maintaining them white), and the door into the lavatory wants a door pull.

The closet space nonetheless doesn’t have lights (however the wiring is there), and I have to make an attic scuttle gap cowl.

The shut space nonetheless wants fairly a bit of labor. I would like to determine what to do with the electrical panel. It has a canopy to go on it, however then what? Maintain it that terrible grey steel coloration? Paint it?
I additionally have to get a TV to go over the dresser, cling the 2 wall mirrors flanking the dresser, and construct cabinets. I’ve modified my thoughts on the design for the cabinets, however I’ll share extra particulars later.

Within the entrance to the room, the ceiling paint nonetheless wants some touchups, and the door must be painted. I additionally want so as to add the wiring and junction field for the brand new mild, after which set up the sunshine. I need to add paintings to the partitions, and the change plates and two extra outlet covers should be painted and put in.

The black dresser within the closet goes to get a makeover.

And eventually, I need to paint Matt’s Theracycle (his train bike), which is an off-white coloration. I need it to be black.
That looks like so much to do, and if I need to meet my aim, I’ve six days to get all of it finished! I can’t assure that I’ll make it, however I’m certain going to strive! Right here’s the record in a easy-to-read format:
- Stain transition strips
- Set up and paint quarter spherical on the baseboards
- Hem the curtains
- Set up the ceiling fan
- Connect the Swedish ladder to the wall
- Paint each doorways white
- Add door pull to door between residence fitness center and toilet
- Set up closet lights
- Make attic scuttle gap cowl
- Work out what to do with the electrical panel cowl
- Purchase TV and cling it on the wall above the dresser
- Cling full size mirrors flanking the dresser
- Make cabinets for the closet space
- Add wiring and junction field for the sunshine within the room entrance
- Set up mild within the room entrance
- Contact up paint on ceiling within the room entrance
- Paint and set up change plates and outlet covers
- Give the dresser a makeover
- Paint Matt’s Theracycle

Addicted 2 Adorning is the place I share my DIY and adorning journey as I transform and beautify the 1948 fixer higher that my husband, Matt, and I purchased in 2013. Matt has M.S. and is unable to do bodily work, so I do nearly all of the work on the home on my own. You’ll be able to study extra about me right here.
I hope you’ll be a part of me on my DIY and adorning journey! If you wish to comply with my initiatives and progress, you possibly can subscribe beneath and have every new publish delivered to your e-mail inbox. That method you’ll by no means miss a factor!